SIP – Sistema Integrado de Processos
Menu: TCCs de Engenharia Civil

Título: LEAN CONSTRUCTION E CRONOGRAMA FÍSICO E FINANCEIRO UM ESTUDO DE CASO EM OBRA DE PORTE MÉDIO

Título alternativo: LEAN CONSTRUCTION AND PHYSICAL AND FINANCIAL SCHEDULE A CASE STUDY IN A MEDIUM-SIZED CONSTRUCTION PROJECT

Autoria de: Matheus Augusto Pantano Nogueira

Orientação de: Priscilla Abreu Pereira Ribeiro

Presidente da banca: Priscilla Abreu Pereira Ribeiro

Primeiro membro da banca: Rafael Santos de Moraes

Segundo membro da banca: Lucas Henrique Pedrozo Abreu

Palavras-chaves: Lean construction, Cronograma físico-financeiro, Gestão de obras, Desperdícios, Engenharia civil

Data da defesa: 19/06/2026

Semestre letivo da defesa: 2026-1

Data da versão final: 06/07/2026

Data da publicação: 06/07/2026

Referência: Nogueira, M. A. P. LEAN CONSTRUCTION E CRONOGRAMA FÍSICO E FINANCEIRO UM ESTUDO DE CASO EM OBRA DE PORTE MÉDIO. 2026. 53 p. Trabalho de Conclusão de Curso (Graduação em Engenharia Civil Bacharelado)-Universidade Federal de Lavras, Lavras, 2026.

Resumo: A gestão eficiente de obras residenciais está intrinsecamente ligada ao desenvolvimento e cumprimento de cronogramas físico-financeiros precisos, bem como ao controle rigoroso do fluxo de materiais. Todavia, o cenário comum nos canteiros de obras revela excessos de insumos e falhas de planejamento que resultam em prejuízos econômicos significativos ao final dos empreendimentos. Neste contexto, a integração da filosofia Lean Construction ao cronograma físico-financeiro surge como uma estratégia fundamental para a redução de desperdícios de tempo e material. Este trabalho teve como objetivo geral desenvolver um modelo de cronograma físico-financeiro para uma obra residencial em Lavras-MG, incorporando princípios e ferramentas da construção enxuta através de plataformas digitais como Microsoft Excel e Miro. A metodologia adotada baseou-se em um estudo de caso com levantamento de quantitativos e definição de etapas construtivas, além da aplicação de um questionário a 15 engenheiros civis de Minas Gerais e São Pau

Abstract: The efficient management of residential construction works is intrinsically linked to the development and compliance of accurate physical-financial schedules, as well as the strict control of material flow. However, the common scenario on construction sites reveals an excess of inputs and planning failures that result in significant economic losses at the end of the projects. In this context, the integration of the Lean Construction philosophy into the physical-financial schedule emerges as a fundamental strategy to reduce time and material waste. The general objective of this study was to develop a physical-financial schedule model for a residential construction project in Lavras-MG, incorporating Lean Construction principles and tools through digital platforms such as Microsoft Excel and Miro. The adopted methodology was based on a case study involving quantity surveying and the definition of construction stages, in addition to the application of a questionnaire to 15 civil engineers from Minas Gerais and S

URI: https://sip.prg.ufla.br / publico / trabalhos_conclusao_curso / acessar_tcc_por_curso / engenharia_civil/index.php?dados=20261202111135

URI alternaviva: sem URI do Repositório Institucional da UFLA até o momento.

Curso: G031 - ENGENHARIA CIVIL (BACHARELADO)

Nome da editora: Universidade Federal de Lavras

Sigla da editora: UFLA

País da editora: Brasil

Gênero textual: Trabalho de Conclusão de Curso

Nome da língua do conteúdo: Português

Código da língua do conteúdo: por

Licença de acesso: Acesso aberto

Nome da licença: Licença do Repositório Institucional da Universidade Federal de Lavras

URI da licença: repositorio.ufla.br

Termos da licença: Acesso aos termos da licença em repositorio.ufla.br

Detentores dos direitos autorais: Matheus Augusto Pantano Nogueira e Universidade Federal de Lavras

Baixar arquivo