SIP – Sistema Integrado de Processos
Menu: TCCs de Engenharia de Controle e Automação

Título: PROPOSTAS DE MELHORIAS PARA O AUMENTO DE CAPACIDADE E CONFIABILIDADE DO SISTEMA DE PRODUÇÃO DE UMA INDÚSTRIA QUÍMICA

Título alternativo: PROPOSALS IMPROVEMENTS TO RELIABILITY AND CAPACITY INCREASE OF THE PRODUCTION SYSTEM OF A CHEMICAL INDUSTRY

Autoria de: Rafaella Bastos Cavaca

Orientação de: Daniel Augusto Pereira

Presidente da banca: Daniel Augusto Pereira

Primeiro membro da banca: Leonardo Silveira Paiva

Segundo membro da banca: Vinicius Miranda Pacheco

Palavras-chaves: Automação, indústria, química, otimização, processo

Data da defesa: 29/04/2022

Semestre letivo da defesa: 2021-2

Data da versão final: 09/05/2022

Data da publicação: 09/05/2022

Referência: Cavaca, R. B. PROPOSTAS DE MELHORIAS PARA O AUMENTO DE CAPACIDADE E CONFIABILIDADE DO SISTEMA DE PRODUÇÃO DE UMA INDÚSTRIA QUÍMICA. 2022. 48 p. Trabalho de Conclusão de Curso (Graduação em Engenharia de Controle e Automação Bacharelado)-Universidade Federal de Lavras, Lavras, 2022.

Resumo: Este trabalho foi realizado em parceria com a empresa BASF S.A., na sede de Guaratinguetá, São Paulo. Nele foi desenvolvido um estudo com foco sobre a linha de produção de fungicidas, visando os dois atuais maiores produtos de venda no mercado, Orkestra e Abacus, a fim de identificar potenciais de melhorias no processo de fabricação dos mesmos através do aumento de capacidade e confiabilidade da planta. Após a análise em toda a etapa de fabricação, foi constatado alguns potenciais de melhorias em relação ao trocador de calor purgo-bomba etapa de dosagem do Pyraclostrobim variáveis de temperatura. Com isso, foi implementado a mudança do setpoint de temperatura durante o processo de dosagem do Pyraclostrobrim, resultando em diminuição de perda da matéria prima e tempo total do processo. A substituição do trocador de calor já foi precificada e terá seu investimento pago em dois meses devido ao benefício estimado. As outras medidas propostas ainda estão sobre análise para implementação. É esperado que após a realização de todas as melhorias p

Abstract: This work was carried out in partnership with the company BASF S.A., at the headquarters in Guaratinguetá, São Paulo. In it, a study was developed focusing on the fungicide production line, aiming at the two current biggest selling products on the market, Orkestra and Abacus, in order to identify potential for improvements in the manufacturing process of the same by increasing capacity and reliability of the plant. After analyzing the entire manufacturing stage, some potential improvements were found in relation to the heat exchanger pump purge Pyraclostrobim dosing step temperature variables. With this, a change in the temperature setpoint was implemented during the Pyraclostrobrim dosing process, resulting in a reduction in raw material loss and total process time. The replacement of the heat exchanger has already been priced and will have its investment paid off in two months due to the estimated benefit. The other proposed measures are still under review for implementation. It is expected that after carrying out all the proposed improvements, the process will become more efficient and generate better quality products.

URI: sip.prg.ufla.br/publico/trabalhos_conclusao_curso/acessar_tcc_por_curso/
engenharia_de_controle_e_automacao/20212201520778

URI alternaviva: repositorio.ufla.br/handle/1/54614

Curso: G022 - ENGENHARIA DE CONTROLE E AUTOMAÇÃO (BACHARELADO)

Nome da editora: Universidade Federal de Lavras

Sigla da editora: UFLA

País da editora: Brasil

Gênero textual: Trabalho de Conclusão de Curso

Nome da língua do conteúdo: Português

Código da língua do conteúdo: por

Licença de acesso: Acesso aberto

Nome da licença: Licença do Repositório Institucional da Universidade Federal de Lavras

URI da licença: repositorio.ufla.br

Termos da licença: Acesso aos termos da licença em repositorio.ufla.br

Detentores dos direitos autorais: Rafaella Bastos Cavaca e Universidade Federal de Lavras

Baixar arquivo